Project: Storage Shed – Part 15

Gino’s been trying to get outside each night to do more work on the shed. But this week we’ve had a few rainy days so work has been delayed due to weather. I hope we can get this done before the real rainy season begins!

I try to help where I can. I tried hammering in the nails to the concrete board and I just don’t have enough force to do it. So he does the hammering all by himself.

2013-08-24 001_edited-1Working on the west end wall. He’s gotten more finished along the front and so we have moved to the west side to begin the siding there. No extra cuts, let’s just get the siding up!

In order for the siding to be under warranty we HAD to add the plastic sheets (can bee seen in the above photo).

The sheet sticks/staples to the wall and overlaps the lower board. The sheet is placed in line with the seams, if the seam should happen to separate, the plastic sheet protects against water damage by channeling the water down and away from the wall. Supposedly.

2013-08-28 001_edited-1

Flashing sheets for our siding.

2013-08-24 005_edited-1Front view looking North. He got the window trimmed out with flashing across the top.
I told Gino it looks more like a fancy playhouse then a shed!