Vacation Bible School – Kingdom Rock 2013

Today is Day 2 of VBS!

She was a bit sad that her friend, Ms. M, wasn’t there today but she still had a lot of fun!

Today they…

  • made a shield
  • played the “human pretzel” game. Everyone stands in a close circle with hands reaching toward the center. You grab hands with someone not standing next to you. As a group you try to untangle the pretzel without letting go.
  • played a “water ball” toss/fight game outside and got wet!
  • “Don’t worry about anything; instead, pray about everything.” Philippians 4:6 – Bible verse for today. She had to say all three verses to get a prize.
  • watched 1 episode of “Chadder the Chipmunk
  • heard a Bible story about Nehemiah persevering to rebuild the wall around Jerusalem (Nehemiah 1-6) – Prayer helps us stand strong.

She’s looking forward to tomorrow.

2013-07-24 001_edited-1

With her awesome shield she made today in VBS!

Vacation Bible School – Kingdom Rock 2013

Today is Day 1 of VBS!

She was super excited to tell me that her best friend from school was there! She also saw 4 other kids from school too but it’s better when your best friend is there!

Today they…

  • made name tag necklaces
  • played a hula hoop game. Everyone stands in a circle, holding hands, while 1 person has a hula hoop. That person has to get through the hula hoop without using their hands.
  • “I love you, Lord; you are my strength.” Psalm 18:1  Bible verse 1 for today.
  • “So encourage each other and build each other up.” 1 Thessalonians 5:11 – Bible verse 2 for today.
  • watched 2 episodes of “Chadder the Chipmunk
  • heard a Bible story about David writing about God’s love (Ps. 23) – God’s love helps us stand strong.
  • heard another Bible story about Mordecai encouraging Ester to do the right thing (Ester 1-9) – Family and friends help us stand strong.

She’s looking forward to tomorrow.

2013-07-23 002_edited-1

Her “Stand Strong for God” VBS shirt!

Project: Storage Shed – Part 5

Gino worked hard on getting more work done on the shed.

He worked all day trying to get the trusses finished but ran out of wood and daylight.

2013-07-21 003_edited-1

Got 2 trusses completed and on the roof.

We had a real scare when the end truss fell off the roof. Thankfully, no one was hurt but the sandbox took damage. So this area is OFF LIMITS (until construction is completed!!) to anyone under the age of 21! The end truss is braced and secured until tomorrow when he stops by the hardware store to get the screws he needs.

Project: Storage Shed – Part 4

This morning we headed out early to get working on the shed.

I mowed the lawn (never again!) while  Gino started work on the shed and Isabel set up in her sandbox.

2013-07-20 002_edited-1

Before work began, we had to move my hydrangea, which made it easier for Gino to get work done.

2013-07-20 003_edited-1

Last night he forgot to had the right support beam for the door, so he did that this morning along with adding the wall paneling.

2013-07-20 024_edited-1

Installing the small 6 inch door header.

2013-07-20 026_edited-1

He replaced the top support beam with a new one.
He later figured out that the pad slopes slightly to the south west.

2013-07-20 028_edited-1

Before heading in for some lunch, he got the window framed in.

2013-07-20 030_edited-1After lunch he got the walls completely covered and then continued working on the window.

2013-07-20 036_edited-1The window is in!

All our shed needs is a roof and door. Let’s take a look inside…

2013-07-20 044_edited-1

Left side of door.

2013-07-20 045_edited-1

Looking out the door.

2013-07-20 046_edited-1

Right side of door.

Tomorrow he begins the work on the roof. While I was getting Isabel into bed for the night. Gino made a jig for the 6 trusses he needs to build for the roof.

2013-07-20 049_edited-1

Cleaning up.
Tomorrow will be another big build day.

Project: Storage Shed – Part 2

Tonight after work, Gino headed out again to work on the shed.

2013-07-15 002_edited-1

He got the west wall up (with a little help from me).
Looks a bit odd right now but I’m sure he’ll be working on it again over the weekend.

2013-07-15 006_edited-1

Looking east.
West wall and north wall.

2013-07-15 008_edited-1

Looking north along east wall.
The south wall is going to take time, making sure he gets the window and door in right.

The 2 foot space around the shed is perfect for pulling weeds and getting debris from the trees.
I’m also liking the noise and view barrier that this shed has already provided.

2013-07-15 010_edited-1

The carpenter!
So proud of him and all his hard work he’s put into this project thus far. He still has a long way to go but with God’s help he can get it done! Way to go, Gino!

Project: Storage Shed – Part 1

Today we worked hard on getting some of the storage shed walls up.

2013-07-14 009_edited-1

Looking north from the patio.
It makes our yard, look so much different!

2013-07-14 010_edited-1Looking east form the north side yard.

Gino did a terrific job getting the wood cut and framed. He did the east wall first and then worked on the north wall, which seemed to go a lot faster then the first wall. The west wall will look like the east wall (above) but the south wall will be more work. The south wall will have 1 small window and door framing in it. I was there to help hold wood in place, lift things and get this or that tool.

Getting excited to see this finally go up! Getting all our garden tools and other garden stuff out of the garage is going to be a huge blessing.