The new faucet get’s installed today!
Getting all the connects connected.
I did the back work since Gino couldn’t get down into the cabinet to connect the water lines to the new faucet. I was proud of myself that I was able to get the fittings tightened since I’m such a wimp.
New garbage disposal, hoses and pipes.
Leak test!
No leaks now time to connect the disposer and give a whirl!
I’ve been waiting for a month and a half. So glad to have the sink complete.