Project: Front Lawn South Side Part 3

It’s finished (well, sort of)!

Our  little  retaining wall is complete. Gino did an awesome  job and I’m really proud of him. I know it was a struggle and frustrating at times but it looks great! Thank you.

2014-08-16 007_edited-1

This area along the garage was updated with “rainbow” rock and crushed stone.
We just need a bit more “rainbow” rock to fill in along the fence (far right).

The original 3/4 rock that was here (above photo) we replaced along our neighbors property line (see below)

2014-08-16 008_edited-1

Completed retaining wall and raised bed area along south side.

2014-08-16 010_edited-1

Looking west toward the street.

We’ll plant some low shrubs in the bed area later. The H.O.A. requires something no more than 3 feet high. So we’ll see; something evergreen for sure.

2014-08-16 013_edited-1

On the sidewalk looking northeast.

The 3/4 rock was just enough to replace all the neighbors rock!

2014-08-16 014_edited-1

As you can see it’s not complete yet, Gino needs to rent a saw to make about 10 cuts for brick along the curve and the ends for each level as it steps up.

Leave a Reply