It’s finished (well, sort of)!
Our little retaining wall is complete. Gino did an awesome job and I’m really proud of him. I know it was a struggle and frustrating at times but it looks great! Thank you.
This area along the garage was updated with “rainbow” rock and crushed stone.
We just need a bit more “rainbow” rock to fill in along the fence (far right).
The original 3/4 rock that was here (above photo) we replaced along our neighbors property line (see below)
Completed retaining wall and raised bed area along south side.
Looking west toward the street.
We’ll plant some low shrubs in the bed area later. The H.O.A. requires something no more than 3 feet high. So we’ll see; something evergreen for sure.
On the sidewalk looking northeast.
The 3/4 rock was just enough to replace all the neighbors rock!
As you can see it’s not complete yet, Gino needs to rent a saw to make about 10 cuts for brick along the curve and the ends for each level as it steps up.