The path less traveled – part V

Paver project – Day 6:
Well, it’s coming along. How does it look? Gino has been going out in the evening and working hard on our pathway. He’s doing a really good job! It looks awesome!

paverpathday6_1.jpg
Corner area.

paverpathday6_2.jpg
Pathway to backyard. The area beyond that (on the right upper hand side) will also have a pathway as well leading to our back patio slab. Where the pallets are located (in the foreground) that area of yard will be grass for Isabel to play in.

paverpathday6_3.jpg
This “hole” will be for a step. The other “hole” areas will be filled with pavers that Gino will have to cut.

paverpathday6_4.jpg
Gino will finish this off out to the corner of the garage.

paverpathday6_5.jpg
Looks awesome! Good job honey! :o)

“Therefore, encourage one another, and build up one another…”
1 Thessalonians 5:11  NAS

The path less traveled – part III

Paver project – Day 4:
Isabel and I headed to church that morning while Gino stayed home to finish up using the compactor; that needed to be returned to the rental place by 1:30 pm. After we returned home from church and returned the compactor, we headed over to Lowe’s and purchased 250 pavers. Unfortunetly, we didn’t make it back over to the landscape place to get a load of sand. Which was alright, Gino picked that up on his way home from work the next day.

paverpathday4_1.jpg
3 layers of gravel/sand mix compacted to 6 inches.

paverpathday4_2.jpg
Pallet of pavers.

paverpathday4_3.jpg
Break time from unloading pavers.

paverpathday4_4.jpg
Checking on wideth, “feel”, and look. We decided to add a matching border which will be placed along the outside edge about where Gino’s hand is.

paverpathday4_5.jpg
Isabel just goofing around on the pavers!

The path less traveled – part II

Paver project – Day 3:
The day was a bit of a disappointment, but that’s the weather in the Pacific Northwest! Gino ended up working outside by himself in the pouring rain. We purchased 3 truck loads of a gravel/sand mix and then rented a compactor to compress the mix between the 3 loads.

paverpathday3_1.jpg
Load 1 of gravel/sand mix.

paverpathday3_2.jpg
Gravel/sand mix before being compacted.

paverpathday3_3.jpg
There was a slight break in the rain so Isabel is helping daddy “compact” gravel/sand mix.

paverpathday3_4.jpg
Compacting in progress!

paverpathday3_5.jpg
Works so good it looks like concrete!

paverpathday3_6.jpg
Load 2 of gravel/sand mix.

paverpathday3_7.jpg

Both loads of gravel/sand mix compacted and complete.
Let’s see what happens tomorrow…

The path less traveled – part I

Paver Project – Day 1:
So we have our new door (B.T.W. – Gino did an awesome job!) and now we need a walkway, so we aren’t walking in the mud. Therefore the paver project begins. Some might ask, “Why pavers and not concrete?” Because concrete takes to long to dig out (if you want to do something different later down the road) and pavers you just lift them up and move. No back breaking work there and other reasons too but we won’t go into that…

paverpathday1_1.jpg
Gino went out after dinner and began the back breaking job of digging out all the rock to make a nice sloped level base. He dug 6 inches down and 4 feet away from the house and 30 feet long of pathway.

paverpathday1_2.jpg
He didn’t get finished this first night.

Paver Project – Day 2:
Since it’s a work day, Gino again headed out after dinner. He actually got all the foundation digging finished this night of the paver project.

paverpathday2_1.jpg
Rounded the corner and working toward the back corner of the house.
Almost there!

paverpathday2_3.jpg
Isabel just loves playing out here and getting dirty! It was very chilly this day with a breeze, so I made her wear a hood. She didn’t mind and it kept her hair outta her face too.