New Credenza – Part 2

We haven’t been able to work on the new credenza but tonight we were able to. We stripped the drawer fronts and got the credenza top stripped as well.

2015-01-24 001_edited-1

Drawers waiting to be stripped.

2015-01-24 002_edited-1

2 of the 9 drawers to be stripped.

The stripper works well for getting the rolled paint off but getting the old stain underneath is going to take some work. Gino has purchased what he will need, so hopefully on a good weather weekend we can really get to work on this project. I’m still super excited about seeing this completed and have it’s new home ready for when it’s complete.

2015-01-24 003_edited-1

3 drawers Gino stripped last night but I didn’t get photos.

2015-01-24 005_edited-1

Close-up of the already stripped drawer face.

2015-01-24 009_edited-1

1 of the 2 credenza doors.

2015-01-24 011_edited-1

Close-up of the hinge on one of the doors.

2015-01-24 016_edited-1

The inside beams (where the drawer sits) were spray painted while the whole outside was painted with a roller.

Leave a Reply