The path less traveled – part VI

Paver project – Day 7:
The day started out with Gino renting a stone cutter (that’s probably not the technical term) to trim down some of the paver’s around the edges. He wanted to get all this trim cutting work done before leaving for vacation in a few days. It worked out really well!

paverpathday7_1.jpg
Making sure the paver’s fit just right around the step.

paverpathday7_2.jpg
The edge close to the garage wall looks really nice.

paverpathday7_3.jpg
Using the masonry saw (technical name) and making sure we measure twice and cut once.

paverpathday7_4.jpg
Look at that cut. Perfect!

paverpathday7_5.jpg
The area were the step will be, he is going to work on later (after vacation).

paverpathday7_6.jpg
The step area with some added leftover gravel/sand mix. Which Gino later took out because it raised the block and paver’s up to high to the door.

paverpathday7_7.jpg
Finished paver walkway. It looks so good!

paverpathday7_8.jpg
Finished corner (besides the step).

paverpathday7_9.jpg
Sneak peak at the what the step will be made of. Cement will fill the the holes of the concrete blocks and brick morter will hold the pavers down onto the step. When the project is complete I’ll take more photos.

Leave a Reply